And all of below!! the last is the most important one!!
A pilot production plant is planned
? Paradox Basin #1 and 3 are ready for production with an expected minimum rate of one million cubic feet per day
? Production rates should be able to be increased with additional stimulation as neither well has been adequately stimulated
? Paradox Basin #3 has produced 9.6 million cubic feet since being stimulated
? Golden State is obtaining prices for a gas plant and the pipeline right of way is ready to be finalised
? Discussion with potential debt financiers are well advanced
Add to My Watchlist
What is My Watchlist?