You guys have it all wrong - SURPRISE-1 RE drilled a vertical thru the entire Lower Stairway Sandstone (gross pay 23 m), thru the Horn Valley Siltstone and into the Pacoota Sandstone to a TD of 2729m. The entire HVS WAS drilled and logged. Do you think the company would describe the source rock/shale gas
potebtial of the HVS without having drilled and evaluated same ?
Multiple announcements to ASX were made from late November 2011 - Dec 2011 advizing drilling - just read one, from 02 Dec 2011 (over 14 months ago !) which gives the formation tops as : HVS 2565 m , Pacoota 2613 m to TD 2729m
The subsequent lateral (SURPRISE-1 REH) was drilled to test the optimum pay zone identified in the LSS
DISCLAIMER : No investment advice expressed or implied. DYOR and read your companys public announcements !!
- Forums
- ASX - By Stock
- CTP
- how accurate is figure 1
how accurate is figure 1, page-8
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
-0.002(3.70%) |
Mkt cap ! $38.75M |
Open | High | Low | Value | Volume |
5.2¢ | 5.2¢ | 5.2¢ | $4.63K | 89.03K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 472949 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.3¢ | 30773 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 472949 | 0.052 |
3 | 440251 | 0.051 |
5 | 407000 | 0.050 |
1 | 125000 | 0.049 |
3 | 288952 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.053 | 30773 | 1 |
0.054 | 12500 | 1 |
0.055 | 464530 | 3 |
0.056 | 100000 | 1 |
0.057 | 345456 | 2 |
Last trade - 14.24pm 16/10/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online