Not likely, too far. It's a 9.5hr trip, one-way.
Assuming the following parameters:
Wiluna to Mulga Rock round-trip = 1,314km
U308 Resin concenrate grade = 1,000ppm
B-Double load capacity = 50tonne
B-Double C1 cost per km = $2.00
Results in a haulage cost of $24/lb.
And you still have to build a resin-in-pulp plant at Wiluna.
This is not a likely option. Unless, I am missing something?
- Forums
- ASX - By Stock
- How low
TOE
toro energy limited
Add to My Watchlist
2.86%
!
17.0¢

Not likely, too far. It's a 9.5hr trip, one-way.Assuming the...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
17.0¢ |
Change
-0.005(2.86%) |
Mkt cap ! $20.44M |
Open | High | Low | Value | Volume |
17.0¢ | 17.5¢ | 16.5¢ | $18.68K | 110.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 508 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 490 | 0.165 |
6 | 72359 | 0.160 |
4 | 230333 | 0.155 |
8 | 158456 | 0.150 |
2 | 13799 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 508 | 1 |
0.175 | 12000 | 1 |
0.180 | 27777 | 1 |
0.185 | 72851 | 5 |
0.190 | 77011 | 3 |
Last trade - 15.44pm 13/06/2025 (20 minute delay) ? |
Featured News
TOE (ASX) Chart |