An open briefing has been released today. Main points, as interpretated by me, are:
Current drilling is designed to 'outline potential' for 500 million tonnes at 1% nickel oxides.
Grade seems to increase at depth
Nickel leaching optimization testwork to be completed in two-three months
Focus seems to be on deeper of two oxide ore types
Will run the capital cost and operating cost estimates for a 50-100,000 tpa plant
Continuing to drill basal contact for sulphides
angus
I hold AEXO
- Forums
- ASX - By Stock
- AEX
- Acclaim - opening briefing
Acclaim - opening briefing
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)