AS1 5.56% 1.9¢ asara resources limited

Quarterly out:Highlights* Diamond and RC drilling completed at...

  1. 64 Posts.
    Quarterly out:

    Highlights
    * Diamond and RC drilling completed at the Netiana Lodes at Balogo. 22 diamond holes were completed (3,844m). Nine holes were drilled with RC pre-collars which totalled 1,441m. An additional eight RC holes totalling 1,073m were also completed.
    * High grade gold intercepts were obtained from diamond drilling at the Netiana Lodes at Balogo. New intersections include 13m at 111.0 g/t gold from 56m, including 4m at 343.0 g/t gold from 57m (BDH012) and 25.9m at 12.3 g/t gold from 55.1m including 1.7m at 172 g/t gold from 65.8m (BDH011).
    * Diamond drilling successfully extended the depth extent of mineralisation in the central portion of the Netiana Lodes from 85m to at least 220m depth.
    * Metallurgical testwork on samples from the Netiana Lodes achieved recoveries exceeding 95% with 49.7% recoverable as a gravity concentrate.
    * Coffey Mining engaged to undertake a Scoping Study of the Netiana Lodes to assess the potential to develop a mining operation.
    * A detailed ground gravity survey was completed over an area of 6km by 2km at Balogo.
    * New drill targets were defined at Sebba with rock samples returning up to 184 g/t gold and 0.8% copper.
    * Terms Sheet for a Farm-Out Agreement was entered into with Blina Minerals NL on the Diapaga Proejct.
 
watchlist Created with Sketch. Add AS1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.