Hi Hoots, thanks for the info on OZL,
the thing that I found interesting from their report was
"The plant achieved its highest throughput since early
2011 and its third highest quarter of throughput to date
with 2.48 million tonnes processed (23 percent above
nameplate capacity). "
23% above nameplate capacity, that is a significant increase & if you were to apply that to the CDU plant capacity it would make a significant difference, especially given the difference between the waste to ore ratios of OZL & CDU & the possible higher grade at CDU.
In the scheme of things, we really only have another 6-7 months before we should start to see the commissioning of the plant. I feel as if we are at last on the down hill slope.
Cheers
cj
- Forums
- ASX - By Stock
- CDU
- how much debt/equity does cdu need to raise
how much debt/equity does cdu need to raise, page-10
-
- There are more pages in this discussion • 51 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)