That and no one to date has converted CSG to LNG..... <<< if you can wait for that day you'll be (and the rest of us) will be one happy camper(s) singing koom-bah-yah.
The pivotal point will be the approval and construction of the first plant in gladstone. Second point will be the first train departing for export (2-3yrs between). Third, the cat(s) will be released amongst the pigeons.....
(Third maybe 2nd but that all remains to be seen)
Everything between now and then requires patience, faith (to hang on for that long) and a constructive outlook on the need for alternative energy. As much as enjoy looking at the share price every day, CSG is still a sector with a long way to go......
Add to My Watchlist
What is My Watchlist?