QPM 0.00% 3.3¢ queensland pacific metals limited

One of the key differences between QPM and SRL is timing.A DFS...

  1. 1,924 Posts.
    lightbulb Created with Sketch. 618
    One of the key differences between QPM and SRL is timing.

    A DFS is a study based on prevailing parameters at a given point in time. Yes, there are a lot of assumptions and forecasts applied with respect to the future, but these are assumptions and forecasts that are deemed appropriate at the time that the study is completed.

    SRL's DFS was completed during a time when costs were much lower. QPM's AFS has been completed at a time of peak inflation.

    Lenders are cognizant of these factors. They would be aware that SRL's build costs would likely be higher now in 2022. They would also be aware that QPM's capex estimate has captured significant inflationary pressures (+40% over the past 12-18 months according to industry reports) and has the scope to reduce.

    All IMO and GLTA.


 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.2¢ 3.3¢ 3.0¢ $425.0K 13.49M

Buyers (Bids)

No. Vol. Price($)
1 100556 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 759250 5
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.