from the ann.
"
Progress: Run in with wireline logging tools. Tools stuck at approx 3,397 mRT. Retrieve part of stuck string. Commence fishing operations, retrieve remainder of logging string. Condition hole prior to logging hole with drillpipe conveyed logs. "
a bit of gobbledegook?
So what is going on now - in plain english please ?
have they got 75% or so of the log now?
- Forums
- ASX - By Stock
- huge hit
from the ann."Progress: Run in with wireline logging tools....
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)