Because the GobiH2 project is progressing as an energy entity which is possibly going to allow Energy independence along with LNG and Nuclear power, Mongolia's future with Elixir Energy, SoftBank and the future transitioning to symbiotic Energy delivery, I thought an open forum about Hydrogen and LNG Gasses are both important to learn about as our World Powers, scientific discoveries, realities economically become our life experiences, life.
So here goes.....Neil Young proposes with years of experience and hard work that the Elixir-GobiH2 project is going to be massively successful, beginning a new Chapter...IMO
- Forums
- ASX - By Stock
- EXR
- Hydrogen Energy Power Grid
Hydrogen Energy Power Grid
-
-
- There are more pages in this discussion • 175 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $167.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 32386 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.5¢ | 10387 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 32386 | 0.145 |
7 | 166759 | 0.140 |
17 | 1588342 | 0.135 |
19 | 1424662 | 0.130 |
17 | 1838573 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 10387 | 1 |
0.140 | 22000 | 2 |
0.145 | 358363 | 3 |
0.150 | 382111 | 9 |
0.155 | 123400 | 3 |
Last trade - 09.34am 06/09/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
Day chart unavailable