the energy is not the topic you need to look at, but scalability of the process. Look at the numbers Posco needs for their steel making, you need to be able to scale up with H2 production in order to achieve the tonnage of H2 fuel needed. You need to eye on how Monolith is able to scale up vs the HZR process and then how the efficiency of the process is. My gut feeling tells me that the HZR process is far easier to maintain and scale up than any plasma process. And scaling up is not adding another reactor, but increasing the reactor sizes, otherwise its not very efficient
- Forums
- ASX - By Stock
- Hydrogen News
the energy is not the topic you need to look at, but scalability...
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
36.5¢ |
Change
-0.015(3.95%) |
Mkt cap ! $87.44M |
Open | High | Low | Value | Volume |
37.0¢ | 37.0¢ | 36.5¢ | $9.97K | 27.04K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 47789 | 36.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
36.5¢ | 12028 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 47789 | 0.360 |
8 | 188280 | 0.355 |
19 | 104876 | 0.350 |
4 | 27398 | 0.345 |
6 | 40500 | 0.340 |
Price($) | Vol. | No. |
---|---|---|
0.365 | 12028 | 3 |
0.370 | 4897 | 3 |
0.375 | 20841 | 4 |
0.380 | 17932 | 1 |
0.385 | 65000 | 3 |
Last trade - 10.16am 17/07/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |