I am interested to find out whether it would be cheaper to build a hydrogen-based smelter near the mine in SE Cameron or a heavy-gauge rail to haul ore to port and what kind of time frame would be required to design and build a rudimentary hydrogen based smelter.
Cheers
Add to My Watchlist
What is My Watchlist?