I did not mean to say they would operate at the supply network pressure levels, rather they have the option of operating at higher pressures because of the supply, the pressure of which they can easily reduce as required. You would hope that the preheating would use waste heat from the system - I think this is what the heat exchanger is used for in the current design.
I do wonder how they intend to test the inductive reactor at higher pressures. I presume the bio gas they receive is at a low pressure, so would need to be increased if they want to test the inductive reactor at higher pressures - which to my mind is the most important test they need to carry out on it.
- Forums
- Charts
- HZR Chart
I did not mean to say they would operate at the supply network...
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.0¢ |
Change
0.005(1.45%) |
Mkt cap ! $80.53M |
Open | High | Low | Value | Volume |
34.5¢ | 35.5¢ | 33.5¢ | $66.17K | 192.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 23100 | 33.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 599 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 23100 | 0.330 |
3 | 8433 | 0.320 |
2 | 20000 | 0.315 |
6 | 62017 | 0.310 |
4 | 109854 | 0.305 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 599 | 1 |
0.360 | 6763 | 2 |
0.375 | 10645 | 2 |
0.380 | 40118 | 4 |
0.390 | 5000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online