We need the scoping study so as to be able to go through to a pre-feasibility study to get to a feasibility study to be able to disclose to the market that we have the resources classified as OREs'.
Point 1. Thats all well and proper and its going to take time. (How much?)
Point 2. The value of the metals can increase whilst in the ground due to demand (good for us but we need to hold).
Point 3. The scoping study when released wont cover production levels, financing or off-take deals, so it wont be much different to what we last got time.
Point 4. The share price hopefully will rise and with the help of upgraded indicated deposits should enable a capital raising by issue of shares/options or some other method to get us digging up the stuff.
Thats me sitting and thinking, and I do a lot of it.
- Forums
- ASX - By Stock
- CNJ
- I Just Sit and Think
I Just Sit and Think
-
- There are more pages in this discussion • 70 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CNJ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.805M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $417 | 416.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
49 | 76099590 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 32200239 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
49 | 76099590 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 22125239 | 9 |
0.003 | 4104642 | 4 |
0.009 | 321000 | 1 |
0.012 | 727272 | 1 |
0.020 | 365789 | 2 |
Last trade - 12.34pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
0.1¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
0.1¢ | 0.1¢ | 0.1¢ | 55555 | ||
Last updated 10.48am 03/05/2024 ? |
Featured News
CNJ (ASX) Chart |