To quote 2 other parts:
"An updated timeline chart is presented as Figure 4. Minemakers aims to be in production during 2010 and, to date, has not identified any issue that cannot be concluded or resolved in that time frame."
and
"Delays experienced during the current drilling programmes have caused some flow-on slowing of the metallurgical testwork and estimation of resources, which are essential components of the economic studies. Other areas are on, or ahead, of schedule."
- Forums
- ASX - By Stock
- AEV
- i like this bit
i like this bit, page-14
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online