Citronen Project’s Feasibility Study
In April 2013, Ironbark was pleased to release the results of the Citronen Project’s Feasibility Report, which confirmed the Citronen Project as a globally significant lead-zinc project.
Highlights of the Feasibility Report included:
Please note this is due to change as oil prices have halved since the was done ...IBG are currently working on revised figures which will make us even more attractive!
- NPV: US$609 Million (US$354M post tax)
- IRR: 32.0% (22.2% post tax)
- Equity Return: 37.9% (Geared NPV after tax)
- Capital Cost: US$429.3 Million inc contingency (US$484.8M with First Fills)
- Operating Cost: US$0.59/lb Zn (Payable, Net of by-product credits, Years 1-5, Smelter fees additional US$0.12/lb Zn)
- Mine Life: 14 years
- Life of Mine Operating Costs: US$3.42 Billion
- Life of Mine Revenue: US$5.65 Billion
http://ironbark.gl/projects/greenland/citronen/
- Forums
- ASX - By Stock
- IBG case
Citronen Project’s Feasibility Study In April 2013, Ironbark was...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IBG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.077M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $10.85K | 3.742M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 22484136 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 31055361 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 22484136 | 0.002 |
6 | 14299989 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 31055361 | 21 |
0.005 | 2500000 | 4 |
0.006 | 4800000 | 2 |
0.007 | 715300 | 3 |
0.008 | 5606448 | 4 |
Last trade - 15.35pm 26/07/2024 (20 minute delay) ? |
Featured News
IBG (ASX) Chart |