IBG 0.00% 0.4¢ ironbark zinc ltd

Please note - the below is about to be revised to reflect better...

  1. 540 Posts.
    lightbulb Created with Sketch. 9
    Please note - the below is about to be revised to reflect better oil prices and improved Efficiencies
    Citronen Project’s Feasibility Study

    In April 2013, Ironbark was pleased to release the results of the Citronen Project’s Feasibility Report, which confirmed the Citronen Project as a globally significant lead-zinc project.
    Highlights of the Feasibility Report included:
    • NPV: US$609 Million (US$354M post tax)
    • IRR: 32.0% (22.2% post tax)
    • Equity Return: 37.9% (Geared NPV after tax)
    • Capital Cost: US$429.3 Million inc contingency (US$484.8M with First Fills)
    • Operating Cost: US$0.59/lb Zn (Payable, Net of by-product credits, Years 1-5, Smelter fees additional US$0.12/lb Zn)
    • Mine Life: 14 years
    • Life of Mine Operating Costs: US$3.42 Billion
    • Life of Mine Revenue: US$5.65 Billion

    http://ironbark.gl/projects/greenland/citronen/
 
watchlist Created with Sketch. Add IBG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $6.375M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $4.833K 1.208M

Buyers (Bids)

No. Vol. Price($)
4 2117531 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 5429982 9
View Market Depth
Last trade - 15.05pm 21/06/2024 (20 minute delay) ?
IBG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.