It's not that I don't think they are fair value or even cheap, it's more the hard slog in front of them and risk involved in starting up production.
The risks are:
The PFS not producing economical numbers.
The terms of a JV and if one can be arranged at all.
The dilution to IDC if a CAPEX needs to be paid for without a loan.
The actual start up of production and cost blow outs.
Delays to any of the above.
It's not that I don't think they are fair value or even cheap,...
Add to My Watchlist
What is My Watchlist?