If I had 500 acres at Narrabri and approval to build a power station and lots of water and lots of gas, I would consider building a combined cycle power plant and a transmission line to the 132 kv grid.
- Forums
- ASX - By Stock
- ESG
- if i had 500 acres at narrabri
if i had 500 acres at narrabri
Featured News
Add ESG (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online