PEN 3.61% 8.0¢ peninsula energy limited

if i was pdn, page-22

  1. 13,367 Posts.
    lightbulb Created with Sketch. 16
    That is one aspect. At the other end of the scale. At start up they build the plant to the expected capacity of all known resources coming online within an acceptable timeframe according to the individual mines production/cash flow analysis.

    Uranerz (nearby to Lance) is doing just that, so the plant will be operational before the second site is ready. This causes a surplus capacity until the next stage comes online.

    PEN will most likely eventually do the same with Lance. However Lance has the potential to be rather large. Along with this may come a need for either continued tolling for the excess they have from the IEU's or alternately to upgrade the plant.

 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
8.0¢
Change
-0.003(3.61%)
Mkt cap ! $254.9M
Open High Low Value Volume
8.3¢ 8.4¢ 8.0¢ $2.227M 27.44M

Buyers (Bids)

No. Vol. Price($)
13 1345233 8.0¢
 

Sellers (Offers)

Price($) Vol. No.
8.2¢ 438252 1
View Market Depth
Last trade - 16.10pm 30/08/2024 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.