The usual fraccing and stimulation so they get good surface and...

  1. 10,745 Posts.
    lightbulb Created with Sketch. 53
    The usual fraccing and stimulation so they get good surface and flow btw the two wells, install heatxchangers and pumps and control systems. Install 2ndary piping from heat exchangers to provide heated water for turbines and connect turbines to the grid.

    (b4 they connect the generatros they intent to provide another well for added base load capacity) All in all a 14 month program to first power/electricity
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
29.0¢
Change
0.000(0.00%)
Mkt cap ! $100.2M
Open High Low Value Volume
29.0¢ 30.0¢ 28.5¢ $109.2K 373.4K

Buyers (Bids)

No. Vol. Price($)
1 1835 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
29.5¢ 3502 1
View Market Depth
Last trade - 15.59pm 20/06/2025 (20 minute delay) ?
PTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.