Highlights
? A Maiden JORC compliant Inferred Resource of 113.6Mt at 0.06% WO3, containing 68,800 tonnes of tungsten trioxide has been estimated for the primary (hard-rock) mineralisation at Mt Carbine.
? Estimation of the resource using a 0.05% WO3 cut-off reports 39.8Mt at 0.14% WO3 for 57,500 tonnes of tungsten trioxide beneath and adjacent to the existing open cut.
? Drilling confirms continuity of mineralisation which remains open at depth and to the north, and along strike to the northwest
Managing Director Dr John Bishop said: ?This maiden JORC Inferred Resource is a 40% increase on
our previous model and confirms the potential for significant long-term tungsten production at Mt
Carbine.
Newminer.
Add to My Watchlist
What is My Watchlist?