Here is why the fracking part is so much more expensive:
The crane hovering over head is on the actual well - which would have needed just one drill rig to dill.
To frac requires something like 200 trucks loads of water, chemical and particles (sand usually)
Just look at all that plant - the trucks are in a pressure train to build the required pressure to fracture the rock - lots and lots of $$ sitting in this picture - and how many people must be employed for this part of the process?
- Forums
- ASX - By Stock
- STO
- Im still cautious
Im still cautious, page-68
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.23 |
Change
0.040(0.56%) |
Mkt cap ! $23.48B |
Open | High | Low | Value | Volume |
$7.25 | $7.28 | $7.20 | $45.98M | 6.353M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 10011 | $7.22 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$7.23 | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6925 | 7.220 |
1 | 10000 | 7.210 |
11 | 26784 | 7.200 |
4 | 7565 | 7.190 |
1 | 500 | 7.180 |
Price($) | Vol. | No. |
---|---|---|
7.260 | 2843 | 1 |
7.270 | 4834 | 3 |
7.280 | 16369 | 5 |
7.290 | 2000 | 1 |
7.300 | 78329 | 9 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
STO (ASX) Chart |