If they have changed the EIS to go to 5.5mt then I presume the mill can ramp up to that.It will be interesting if it could do 10mt pa if allowed.
They have the ground water (?) and everything ready to go to 5.5 but if they wanted to mine more pa then might have some changes to put in place.
I personally think its capable of 10mt pa if allowed.But Im guessing