If the existing programmes are to believed EPM is in line for grant funding which could "eclipse" it's market cap if were to be in the upper end of the spectrum.
But realistically EPM would be self-sufficient if it navigates the Greenland Mining framework to enable removal of the tailings adjacent to Ivigtut pit, which is presently leeching into the pit water / sea. And that will take a while to sort out -in saying that it has mine life of it's own.
- Forums
- ASX - By Stock
- In Greenland
If the existing programmes are to believed EPM is in line for...
-
- There are more pages in this discussion • 70 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EPM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.50M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 548689 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 548690 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 548689 | 0.007 |
6 | 3964796 | 0.006 |
7 | 2951335 | 0.005 |
3 | 2487888 | 0.004 |
4 | 2591666 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 548690 | 1 |
0.007 | 1374819 | 1 |
0.008 | 2598107 | 5 |
0.009 | 2000000 | 2 |
0.010 | 4181860 | 8 |
Last trade - 09.00am 30/07/2024 (20 minute delay) ? |
Featured News
EPM (ASX) Chart |
Day chart unavailable