U r right there IAM, W#1 was a 14 day drill to TD + another 2 wks to rig release (this included flowtesting). Interestingly enough, CVX's Iago-1 was all over in 18 days. Those old issues r handy for a quik research, glad u looked them up. Note that each well is different & MEO did drill Z#1, using the SV in record time (bar the 2 TC's).
Things should get interesting at A#1, around the 8th of Dec, IMHO. So watch the volume frm nxt thursday onwards.
This week's update should b routine, i.e drilled top hole, set 13" casing etc.
The 12.25" openhole section is where the dealbreaker (or maker) is, at A#1. Hang on tight.
- Forums
- ASX - By Stock
- MEO
- in petrobtras i trust
in petrobtras i trust, page-37
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)