Mine production needs to be consistently at the 2600-2800tpa to keep the plant fully fed (given mining is not 24/7, unlike the plant), so still some way to go there. Increasing proportion of stope vs development also is required to push grade over the 4.5 g/t mark. I'm think we should get about 11,000oz this quarter, but possibly 18,000 oz in September. Need to get things consistent good for two or more quarters.
angus
- Forums
- ASX - By Stock
- PLA
- increased production
increased production, page-15
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)