It wasn't a BFS, it was a PEA - "preliminary economic assessment". Which as far as I can tell is a scoping study, certainly not bankable. The shallow (and therefore potentially open pit-able) bit of their resource was about 8-10mt@ ~3%Cu - but they've done far less drilling than CDU so they may be able to expand it.
But there's something about CDU, right campers??