well when thay only had one mine thay said 480000tpa from march . than thay got mine 2 and thay said it was the same as mine 1.so to me it looks like mine 2 starts in january at about 500000 tpa and then in march mine 1 kicks in at about 500000 tpa.than if thay upgrade the mines like thay said it will be 2mtpa by 2011 .be nice if it happend like that