AJL 11.1% 1.0¢ aj lucas group limited

Infrastructure Bill, page-4

  1. 1,726 Posts.
    lightbulb Created with Sketch. 30
    DarwinEurope ,

    What do we mean by "the verge" though ? Somewhere before fall 2016 if the election result isn't a total disaster ?

    Have Cuadrilla already started monitoring water at those sites to the satisfaction of the infrastructure bill (which is still fluid) ?

    If not then if the Bill really insists on a full 12 months of monitoring then there isn't going to be any hydraulic fracturing (and I would suggest no drilling either) in 2015 .
 
watchlist Created with Sketch. Add AJL (ASX) to my watchlist
(20min delay)
Last
1.0¢
Change
0.001(11.1%)
Mkt cap ! $13.75M
Open High Low Value Volume
1.0¢ 1.0¢ 0.9¢ $1.158K 116.5K

Buyers (Bids)

No. Vol. Price($)
2 476435 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 280678 1
View Market Depth
Last trade - 16.10pm 10/07/2024 (20 minute delay) ?
AJL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.