SYR 4.17% 23.0¢ syrah resources limited

infrastructure, page-8

  1. 752 Posts.
    lightbulb Created with Sketch. 91
    Hi Redgum,
    As you rightly point out the all weather road from Balama to Pemba is completed with bridges over all river crossings. Maybe TJ is referring to the seasonal creek crossings between the road and the graphite mountain.
    These are absolutely irrelevant in the scheme of things and will be dealt with appropriately during the course of construction.
    Yes, an all season crossing will be built and will be in place prior to shipping commencing. How important is this on the scale of 1 to 100? About 99 I reckon. We are talking about one 10 meter wide creek crossing and another few smaller "ditches".
    Pathetic that it was even raised by TON as a point of difference.
 
watchlist Created with Sketch. Add SYR (ASX) to my watchlist
(20min delay)
Last
23.0¢
Change
-0.010(4.17%)
Mkt cap ! $238.0M
Open High Low Value Volume
24.0¢ 24.5¢ 23.0¢ $1.235M 5.260M

Buyers (Bids)

No. Vol. Price($)
15 655368 23.0¢
 

Sellers (Offers)

Price($) Vol. No.
23.5¢ 140188 2
View Market Depth
Last trade - 16.10pm 08/08/2024 (20 minute delay) ?
SYR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.