I've a vague recollection from one of the reports on GBM that there was an intention to blend the 1oz per tonne hard rock from underground with soft tailings at 1 gm per ton, and that they have 100,000 tonnes of tailings at 1 gms per tonne. I've been told that it more normal to get 3 to 5 gms per tonne from tailings from pre 1990's tailings.
I guess the blending of hard and soft material makes it easier while new gear settles in?
I'd still like to see more info on the plant.
Also, they have 9 tenements, but have only issued a resource statement on 1 tenement. What about the other 8?
- Forums
- ASX - By Stock
- inglewood project updated
I've a vague recollection from one of the reports on GBM that...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)