ADT 0.00% $3.49 adriatic metals plc

Initial Kizevak Drill Results Released, page-37

  1. 105 Posts.
    lightbulb Created with Sketch. 15
    cv19 has altered timeframes globally. Not to recognize this as a legitimate reason for delayed drilling as well as any other delays is ludicrous. PC lost control of any kind of accurate scheduling and forecasting as a result. Changing personnel is standard as a the story builds. Different stages of development require different skill sets. Had they not changed out personnel would be the larger concern.
 
watchlist Created with Sketch. Add ADT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.