- Continuous atmospheric process aims to increase production rates and reduce
costs by over 90%
The 24 month DOE project has a number of key targets and objectives:
– Installation and Commissioning of Continuous Kiln (Months 1-7)
– Carbon Foam Panel Manufacture Optimization (Months 7-12)
– Carbon Foam Panel Process Development and Characterization (Months 7-12)
– Applications Development of Carbon Foam Panels (Months 7-12)
– Installation of Carbon Foam Aggregate Forming and Sizing Equipment (Months 12-15)
– Carbon Foam Aggregate Manufacture Optimization (Months 15-22)
– Carbon Foam Process Development (Months 15-22)
– Characterization of Carbon Foam Aggregate (Months 15-22)
– Application Development of Carbon Foam Aggregate (Months 15-22)
–Techno-Economic Studies and Market Analyses (Months 12-24)
this is great news why was this not pushed more like price sensitive i know it cost money but this needs eyes on it
- Forums
- ASX - By Stock
- Innovaero targets $1.6b contract
- Continuous atmospheric process aims to increase production...
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CFO (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.468M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CFO (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online