re: aegis quarterly december 2004 report I hope the construction engineers on the PNA heap leach do a better job than their last one at Svartliden for Dragon. Dragon kicked them off the site before the job was finished. Could head for the courts.
Heap leach projects are pretty low risk compared to CIL, so risk at Phu Bia should be low.
acturtle
- Forums
- ASX - By Stock
- ** institutional buyer - its official **
re: aegis quarterly december 2004 report I hope the construction...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla