so quiet - perhaps need reminding from last announcement released 4th September 2013
"As previously reported, production testing was suspended when the coiled tubing became stuck inside the production test tubing due to an accumulation of lost circulation material (LCM) produced from the Abiod Formation fractures. Since the last report issued on August 22 the coiled tubing and the production test string were successfully recovered with the complete string on surface at August 27. Subsequently the bit was run in hole and a staged program of circulation and mud conditioning was undertaken to clean the wellbore and remove gas from the drilling fluids. The test string will now be re-run and it is currently expected that the well will be opened for flow testing early in the week of September 9. The aim of the test is to obtain a clean hydrocarbon flow from the reservoir section."
All GREEN LIGHT testing flow from Monday. Hopefully the BIT will give the well hole a NICE final clean out.
JKA Price at posting:
13.1¢ Sentiment: Buy Disclosure: Held