"Goro is expected to produce.....the equivalent of 4.5 per cent of this year's anticipated global production .... Goro was scheduled to begin production next year .... delayed... unofficially "maybe to 2009 or longer."
Possibly 2-3 years of escallating nickel prices. MRE's true valuation is basically unknown at this point.
- Forums
- ASX - By Stock
- interesting ni supply article
"Goro is expected to produce.....the equivalent of 4.5 per cent...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MRE (ASX) to my watchlist
(20min delay)
|
|||||
Last
87.0¢ |
Change
0.000(0.00%) |
Mkt cap ! n/a |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online