Why bother mate this bloke is called troopy loopy for a reason , extra intervention ha ha ! HX has a driver who is the tablet operator, a labour to put in brick ties , same person to swing in place brick lintels , same person to slide in door frames and load blocks into back of HX ! and structure built in one day ! Drive in drive out no waste , no down time , no safety issues , no site clean ! Extra labour what extra labour ??Shall we go into what it takes to build a timber structure and the amount of intervention ha ha ha . He’s really delusional anyone listening to this garbage deserves to join his huge labour force to put up a stick structure Extra manpower ha ha ha what a joke you gotta do better than that loopy troopy. Xx peeps for trying ha ha .
- Forums
- ASX - By Stock
- International Expansion
Why bother mate this bloke is called troopy loopy for a reason ,...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $236.3M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 700 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 642553 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 700 | 0.053 |
1 | 76923 | 0.052 |
1 | 81632 | 0.049 |
6 | 624627 | 0.048 |
9 | 783120 | 0.047 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 642553 | 2 |
0.049 | 696327 | 3 |
0.050 | 707313 | 3 |
0.051 | 498977 | 6 |
0.052 | 1495632 | 5 |
Last trade - 09.36am 02/10/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
Day chart unavailable
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online