I think VDT is a factor, but I don’t think it was a sole reason. If you look at the 2 amendments of the proposal that were lodged during this EPA process, seemed to me that the 1st one, not obvious, but EPA probably influenced it. 2nd however, definitely due to EPA.
Those lodgements involved back and forth, so would still happen with / without VDT.
I shared Bruce and others frustration with the prolonged process.
If I look really really really hard into it, maybe I could find a silver lining that other projects would likely have their own share of issues and delay. So hopefully, there are first mover advantages that could be capitalised, some good contracts, maybe?
- Forums
- ASX - By Stock
- [INTERVIEW] From the Floor with VRX Silica Managing Director - Bruce Maluish
I think VDT is a factor, but I don’t think it was a sole reason....
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
NVA
Nova locks in NASDAQ US market listing at a value of only US$3.3M as ASX gets quieter and quieter
Add VRX (ASX) to my watchlist
|
|||||
Last
3.6¢ |
Change
-0.003(7.69%) |
Mkt cap ! $21.98M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.5¢ | $20.75K | 584.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 70429 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 128317 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 70429 | 0.036 |
2 | 774771 | 0.035 |
1 | 150000 | 0.034 |
1 | 45454 | 0.033 |
2 | 115625 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 128317 | 1 |
0.038 | 48271 | 2 |
0.039 | 186660 | 1 |
0.040 | 31200 | 1 |
0.042 | 11626 | 1 |
Last trade - 11.28am 29/07/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |