FHE 4.35% 22.0¢ frontier energy limited

[INTERVIEW] Frontier’s Waroona: the right renewable energy project, at the right time, page-10

  1. 151 Posts.
    lightbulb Created with Sketch. 49
    Funding is out for tender to 20 financial institutions. There is a 12 month wait for the solar panels to be manufactured and operations are expected to take place within two years .
 
watchlist Created with Sketch. Add FHE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.