Re the proposed Dubbo metallisation plant...
Due to the concern of oxidation of finished RE metals if not used promptly after production, I wonder if they could be shrink wrapped in heavy duty plastic film to avoid oxidisation while in transit and storage. It works for that half used avocado you put in the fridge yesterday.
I believe Lithium Hydroxide is shipped and stored in bags to avoid contact with water (due to potential fire hazard). So there may be steps that can be taken to resolve the oxidisation issue.
If this is possible, I want any royalties arising from the use of this ground breaking process.
- Forums
- ASX - By Stock
- Interview with MD ...live today
Re the proposed Dubbo metallisation plant...Due to the concern...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASM (ASX) to my watchlist
|
|||||
Last
80.5¢ |
Change
-0.015(1.83%) |
Mkt cap ! $145.8M |
Open | High | Low | Value | Volume |
82.0¢ | 83.0¢ | 79.0¢ | $384.5K | 476.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 11039 | 79.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
80.5¢ | 36943 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 11039 | 0.790 |
2 | 4436 | 0.785 |
4 | 22210 | 0.780 |
3 | 6295 | 0.770 |
1 | 10000 | 0.755 |
Price($) | Vol. | No. |
---|---|---|
0.805 | 31443 | 1 |
0.810 | 19000 | 1 |
0.820 | 643 | 1 |
0.830 | 125487 | 1 |
0.840 | 2051 | 1 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
ASM (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online