yes....
"Hole AAND-082 enters low grade sulphide ore at ~11m a True Depth
of less than 8m before intersecting higher grade material which is
much shallower than expected
Ø?AAND-082 indicates that Pre-Stripping maybe be a fraction of that budgeted in the FS"
and...they've placed deposits on 3 pieces of equipment :)
yes...."Hole AAND-082 enters low grade sulphide ore at ~11m a...
Add to My Watchlist
What is My Watchlist?