Stage 1 - is to refurbish turbine hall 2 with the indicative installed power requirements of the base case process plant = 28 MW3 . 2 duty and 1 standby unit ▪ Stage 2 - is to refurbish turbine hall 1 with the additional indicative installed power requirements of process plant Stage 2 4 = 12.3 MW3 . 2 duty and 1 standby unit. ▪ Stage 1 and 2 combined will provide 40.3 MW guaranteed power output ▪ New HV power line and pylons to site ▪ 3 x ESIAs Approved ▪ RFTs for refurbishment in the market ▪ Studying to convert electrical excess renewable power to other uses, e.g., hydrogen for Fuel Cell Electric Vehicles (FCEV) use
- Forums
- ASX - By Stock
- AVZ
- Ann: Investor Presentation
Ann: Investor Presentation, page-2
- There are more pages in this discussion • 260 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.752B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AVZ (ASX) Chart |
Day chart unavailable