AEV 0.00% 0.9¢ avenira limited

"On the other side the resource estimate has slipped into the...

  1. 893 Posts.
    "On the other side the resource estimate has slipped into the 4th quarter."

    Sort of expected this, imo it will be released in October with the pre-feasibility. Basically it looks like they kept finding more and more with the drilling, so the drilling kept getting extended. I don't think this will have any effect on when they start production. Expect a large jorc when it is released. Even now they have probably only drill out a fraction of the total resource but it will probably be enough to support a mining operation for our lifetime.

    If they get 6mt up and going, good luck to anyone else getting rail/port space. Minemakers are in a unique position imo.


 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $24.33M
Open High Low Value Volume
0.9¢ 0.9¢ 0.9¢ $27.26K 3.029M

Buyers (Bids)

No. Vol. Price($)
2 2171348 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 504157 4
View Market Depth
Last trade - 11.06am 01/11/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.