AGO 0.00% 4.5¢ atlas iron limited

io price, page-340

  1. 1,245 Posts.
    lightbulb Created with Sketch. 159
    West Coast, just trying to help here. The Freight cost of $12.19 & $13.68 in the table were the shipping costs not the trucking cost.Trucking costs are included in the operating cost figures of $49-51/t. The CFR price is the Cost plus Freight (shipping) cost i.e landed cost, whereas FOB is obviously the Freight of Board price. Therefore the difference between the two is the shipping cost. It's very possible cost have come down slightly. If you have a source on the current shipping cost then post a link/reference and that will shut up anyone that is doubting you.

    Yeatesy.
 
watchlist Created with Sketch. Add AGO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.