The Portland, KL3 and KL4 flow tests, each planned for around...

  1. 198 Posts.
    lightbulb Created with Sketch. 5
    The Portland, KL3 and KL4 flow tests, each planned for around 30-40 days duration, will consist of a sequence of stabilised steady state flow and shut in periods to establish the oil in place ("OIP") directly connected to the well. A short maximum flow-rate test will also be included for each reservoir. If time permits, a further short-term test of a deeper untested Kimmeridge reservoir may be undertaken.



    Testing will commence with the Portland reservoir, which in the Company's opinion, given the 323 bopd stable pumped rate achieved in 2016 and the 32 million barrels most likely OIP calculated by Xodus in 2017, is a strong candidate for commercial viability. Subject to a successful test, a Portland commercial declaration is expected to be made by mid-2018. A Kimmeridge commerciality declaration would follow programme completion and analysis of reservoir engineering data.



    2018 Horse Hill Drilling Programme



    Subject to a successful testing outcome in the Kimmeridge and Portland, the HH-2 well is planned as a future Portland producer, with an expected spud towards the end of Summer 2018. Drilling plans include optionality to deepen HH-2 into the Kimmeridge to gather core and image log data, together with a possible northwards deviation to access the adjacent oil bearing Collendean Farm fault block's significant Portland OIP.



    The HH-1z Kimmeridge sidetrack spud is now planned for 2019 following construction of a Kimmeridge reservoir model utilising HH-1 Kimmeridge production data, reservoir data from the Company's 100% owned Broadford Bridge-1 & 1z Kimmeridge discovery and any future HH-2 Kimmeridge core.
 