FMG 0.06% $16.12 fortescue ltd

Iron Ore Price, page-15951

  1. 2,551 Posts.
    lightbulb Created with Sketch. 1
    Hey frank my answer to that question is a definate yes (more io anyone? )
    Some don't realise the amount of steel needed to build 175.000 km of track.
    If im to calculate it .
    We are talking 2 tracks one in each direction
    2 x 2 rails on each track.
    175.000 x 4 rails is equal to 700.000 km of rail.
    Lets calculate 1 meter of rail at 100kg
    So there is 7 000.000 meters in total.
    We multiply 7.000.000 by 100kg that being for per meter .
    We would need 700.000.000 kilos of metal to complete track
    All my calculations are based of my estimate of 1 meter of track weighing in at 100kg it could be more .
    Plus there is more needed for linking tracks swiches etr.
    Good luck all
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
(20min delay)
Last
$16.12
Change
-0.010(0.06%)
Mkt cap ! $49.63B
Open High Low Value Volume
$16.30 $16.35 $16.00 $142.8M 8.831M

Buyers (Bids)

No. Vol. Price($)
7 18592 $16.10
 

Sellers (Offers)

Price($) Vol. No.
$16.14 3138 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
FMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.