Hi Rich
Maybe if it were not for the hedging we'd be 10c.
Half of this 1/4 is hedged, lets say they produce 1 million tonnes per month. So 50% would be the same result as the Dec 1/4
So far i have this 1/4 iron ore about $13-$15 higher than Dec 1/4 minus the average C1 increase of $2.50. So lets say the remaining 50% production of 1.5 million tonnes is making $10/t more than last 1/4
Is it then fair to say $10.00 x 1,500,000 = $15,000,000.00 extra profit over the Dec 1/4
NET OPERATING CASH FLOW $70 MILLION ????
![]()
- Forums
- ASX - By Stock
- AGO
- Iron ore price
Iron ore price, page-502
-
- There are more pages in this discussion • 9,989 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)