-
Share
5,816 Posts.
1786
14/03/18
00:41
Share
http://www.mining-journal.com/bulks/news/1316573/anglo-stops-brazil-production-after-pipe-leak
A busted pipeline reported today at Minas Rio operated by Anglo has caused leakage into a stream. Production has now halted.
Minas Rio produced 17m of high grade ore in 2017. They were given approval to expand capacity to 26.5m tonnes 2 months ago.
-