FMG 1.86% $19.54 fortescue ltd

Iron ore price, page-21939

  1. 3,925 Posts.
    lightbulb Created with Sketch. 764
    In addition, the 25 tailings dams that were refused permits to reopen, were linked to the resumption of 40Mt pa in production- so the lowered guidance from 340-355Mt pa to 310-330 Mt pa was barely in the range. The refusal to give the green light to the dams was connected with COVID-19 related inspection delays.
    Last edited by jhunt: 07/06/20
 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.